PUMA DNT2100M
- Class-Leading Spindle Power: Equipped with the most powerful spindle in their category, enabling efficient and precise machining.
 - Innovative Tool Post Design: Ensures powerful and accurate cutting, contributing to exceptional productivity and quality.
 - User-Friendly Operation: The ergonomic design simplifies operation and maintenance, reducing downtime and enhancing overall usability.
 
Highlights
- Travels - X Axis Travel distance (mm): 230
 - Travels - Z Axis Travel distance (mm): 580
 - Chuck size (mm): 210
 - Max. Turning Diameter (mm): 320
 - Max. Turning Length (mm): 513
 
Series description
| 
 The PUMA DNT 2100/2600 series consists of 8- and 10-inch turning centers featuring the most powerful spindle in their class. These machines are designed with an innovative tool post concept that ensures powerful and precise machining, enhancing productivity. The user-friendly design facilitates convenient operation and easy maintenance, making them ideal for high-performance machining tasks.  | 
				
		DETAIL1511
		https://youtu.be/eFo2Z2rY_mo
		https://youtu.be/eFo2Z2rY_mo
			
			
			
	
			
		DETAIL1511
		https://youtu.be/eFo2Z2rY_mo
		https://youtu.be/eFo2Z2rY_mo
			
			
			
	
			Specifications
Travels
| Travels - X Axis Travel distance (mm) | 230 | 
|---|---|
| Travels - Z Axis Travel distance (mm) | 580 | 
| Travels - X Axis Rapid Traverse (m/min) | 24 | 
| Travels - Z Axis Rapid Traverse (m/min) | 30 | 
Tool storage capacity
| Machining center - No. of tool station | 12 | 
|---|
Capacity
| Chuck size (mm) | 210 | 
|---|---|
| Max. Turning Diameter (mm) | 320 | 
| Max. Turning Length (mm) | 513 | 
| Bar Capacity (mm) | 67 | 
Turret
| Rotary Tool (r/min) | 6000 | 
|---|
Dimensions
| Length (mm) | 2945 | 
|---|---|
| Height (mm) | 1780 | 
| Width (mm) | 1664 | 
| Weight (kg) | 3700 | 
| Name | Download | File type | |
|---|---|---|---|
| 
					
			 | 
											PUMA_DNT2100.pdf | 5571 KB | |
| 
					
			 | 
											TOOLING SYSTEM-PUMA-DNT2100-2600.pdf | 750 KB | 
Series delivery and installation
| 
 The project team manages the entire process, including delivery, installation, and commissioning of the machine, ensuring a seamless project flow. The project team ensures coordination and communication between the project's parties, including the customer, Duroc Machine Tool, and any third-party subcontractors.  | 
				
Contact us
If you have any questions, don't hesitate to contact us.