Default
DETAIL1465
DETAIL1466
DETAIL1468

PUMA 4100MC

  • High Precision and Rigidity: The robust box guideway structure and high torque motors ensure stable and precise machining, even for challenging materials.
  • Versatility in Applications: Optional Y-axis and threading functions enable the handling of complex workpieces, making the machines suitable for a wide range of industries.
  • Efficient Power Transmission: The two-step gearbox delivers optimal power and torque, enhancing machining efficiency and productivity for medium to large workpieces.

Highlights

  • Travels - X Axis Travel distance (mm): 352
  • Travels - Z Axis Travel distance (mm): 1105
  • Chuck size (mm): 530
  • Max. Turning Diameter (mm): 550
  • Max. Turning Length (mm): 938

Series description

PUMA 4100/5100 series machines are horizontal turning centers designed for machining medium-tolarge size workpieces. They are powerful machines using a two-step gearbox and high torque motors and feature a rigid box guideway structure. Selected models can process complex workpieces by using the optional Y-axis function and, optional DN Solutions threading functions, especially useful for oil and gas parts, make PUMA 4100/5100 machines the ideal solution for many industries and applications.

DETAIL1468 https://youtu.be/wrYPdkKxhto https://youtu.be/wrYPdkKxhto

Travels

Travels - X Axis Travel distance (mm) 352
Travels - Z Axis Travel distance (mm) 1105
Travels - X Axis Rapid Traverse (m/min) 16
Travels - Z Axis Rapid Traverse (m/min) 20

Tool storage capacity

Machining center - No. of tool station 12

Capacity

Chuck size (mm) 530
Max. Turning Diameter (mm) 550
Max. Turning Length (mm) 938
Bar Capacity (mm) 165,5

Main spindle

Main Spindle Max. Speed 2800
Main Spindle Max. Power 37
Main Spindle Max. Torque 2432

Turret

Rotary Tool (r/min) 4000
Turret - No. of tool station 12

Dimensions

Length (mm) 4654
Height (mm) 2184
Width (mm) 2056
Weight (kg) 10600

The project team manages the entire process, including delivery, installation, and commissioning of the machine, ensuring a seamless project flow. The project team ensures coordination and communication between the project's parties, including the customer, Duroc Machine Tool, and any third-party subcontractors.